Based on the latest web cams.
Engineering Webcam of stadium
It will be interesting having the students and band at the other end.
Engineering Webcam of stadium
It will be interesting having the students and band at the other end.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Sod can take root in 5-15 days in warm weather. 30 days or more with colder temperatures...They may experience some loose turf causing injuries, only 4 weeks away
I trust our turf management team— they are world- class.Sod can take root in 5-15 days in warm weather. 30 days or more with colder temperatures...
should be good for the 1st game but I'm more concerned w/ 4 of the first 5 games are at home. By the time of the Illini game it may be rough?Hard to say for sure but looks like drainage improvements are taking place prior to sod going down. I have confidence in the turf team. Still worried about overall readiness. Lots of work to be done, systems to be tested, and clean up to happen to be game day ready.
I think what I thought were drainage improvements, might have been sprinkler system modifications. Also, sod is going in today. It's amazing how much progress is made week over week. The new structure looks great. Can't wait to see how the new tunnel looks when completed. Will bleachers be going back in over the new tunnel section or will that be left open?should be good for the 1st game but I'm more concerned w/ 4 of the first 5 games are at home. By the time of the Illini game it may be rough?
I think I read that there will be special seating above the tunnel (read: expensive), but it won't take up the entire area, since it will be a walkway too.I think what I thought were drainage improvements, might have been sprinkler system modifications. Also, sod is going in today. It's amazing how much progress is made week over week. The new structure looks great. Can't wait to see how the new tunnel looks when completed. Will bleachers be going back in over the new tunnel section or will that be left open?